Driving improvement in asset integrity
Creating a blended team to ensure asset performance improvement
Sort by: Relevance | Date
Edit Search
Creating a blended team to ensure asset performance improvement
South Stream Transport B.V. is building the TurkStream pipeline system to export gas across the Black Sea from the Russian coast at Anapa to a landfall at Kiyiköy, Turkey. TurkStream comprises: two pipelines for 31.5 BCM/yr, 32-inch outer diameter, 940 km each, 2200m maximum water depth, 50-year design life, 300 bar design pressure. Construction on the TurkStream pipeline system started in 2017, and first gas is planned by the end of 2019.
IntecSea is supporting VAALCO Energy in the operations and maintenance phase of their ETAME facilities in the shallow waters off the coast of Gabon. We are managing a subsea repair campaign for the corrosion protection system, have carried out risk-based integrity assessment, developed a pipeline integrity management system (PIMS), and are engineering an overall field development plan to ensure continued production from this project for the foreseeable future
The Nikaitchuq field development consists of the Spy Island Drillsite (SID) artificial island, tied back to shore at the Oliktok Point Production (OPP) facility on the North Slope of Alaska via a 3.6 mile long buried offshore pipeline bundle which contains a 14-inch x 18-inch pipe-in pipe (PIP) production flowline.
Providing detailed design and procurement packages.
This effort, the first exploration program of its kind outside of North America, involved exploring and delineating heavy oil deposits in Madagascar, the third largest oil sand deposit in the world.
Advisian (previously WorleyParsons) acted in a leadership role for an initial refinery expansion study as part of an integrated team.
The Suez Oil Company (SUCO) is currently in the process of developing and implementing a Pipeline Integrity Management System for their Disouq and Gulf of Suez (GOS) hydrocarbon fields in accordance with recommended international standards.
Guiding a metals company to meet emissions standards for their large-scale copper smelter operations.
Vår Energi is planning to reuse the Jotun A FPSO for its “Balder X Future” project to develop additional hydrocarbon resources in the Balder development area of the Norwegian North Sea.