Case Study

Nikaitchuq Flowline Repair

Repair Pipe Being Installed Through the Roller System

INTECSEA was engaged to perform engineering, procurement, and construction support for the repair of the multiphase production flowline between Spy Island Drillsite and the Oliktok Point Production at the Nikaitchuq field development.

The Challenge

The presence of internal corrosion in the production flowline necessitated a repair of the line to ensure a leak did not occur, and to minimize the overall impact on long-term production.

Our Approach

Work included an initial evaluation of the integrity of the flowline to ensure the remaining pipe wall thickness would reliably maintain production.  This was followed by an in-depth evaluation of options available for repair, considering site-specific conditions, duration and window of opportunity to repair, and cost.  Once a repair option was selected, detailed design, procurement and construction began.

The Results

The repair was successfully completed in December 2018.  Production through the repair pipe will be enhanced with the installation of two multi-phase pumps, which are expected to be in service later in 2019.

Topics

You might also be interested in

Case study
Providing operational assurance to ensure efficient start up of subsea tie back
General Content
Oil Spill Tracking Buoy
Case study
Driving improvement in asset integrity
General Content
Advisian excited to share expanded global capabilities at Subsea Expo 2019