Case Study

Air permit review

refinery

Early involvement of atmospherics experts in the permitting process and agency coordination helped streamline approvals and reduce delays in project schedule.

The Situation

Our client was expanding a chemicals complex at Lake Charles, LA however, the proposed expansion was deemed to be a potential source of air pollutants according to local regulations.

Approach

Advisian provided Advisian provided support, regulatory guidance and oversight to the engineering teams during the review of the individual air permits for each new/expanded process unit. This was to confirm that the permitted conditions for each emission point agreed with the design of the units and the associated infrastructure.

The permits were reviewed in a two-phased approach:

  • Review of unit designs before construction to confirm permits captured all new emissions sources
  • Review of unit designs to capture changes to design prior to initial operation

Results

The permits were modified to reflect the as-built design. Advisian reconciled engineering design with permit requirements through effective inter-disciplinary coordination and strong technical knowledge.  

Topics