English (United States)
Select a Language

    Asia Pacific

  1. English (AU)

    Americas

  1. English (US)

    EMEA

  1. English (UK)
Case Study

Liquid Niugini Gas Project - Environment and Social Impact Assessment

Helicopter on pad near river

Liquid Niugini Gas required an Environment and Social Impact Assessment for the earlier proposed 12Mtpa LNG Facility and 360km gas pipeline.

The Situation

Liquid Niugini Gas required an Environment and Social Impact Assessment for the earlier proposed 12Mtpa LNG Facility and 360km gas pipeline. 

Approach

Advisian’s Environment and Social Impact Assessment (ESIA) included:

  • Site selection support for the LNG facility

  • Route selection support for the gas pipeline

  • Government interfacing

  • Stakeholder and community relations strategy

  • Biological surveys

  • Social assessment

  • Soil surveys and hydrological studies

  • Field surveys of the 360km gas pipeline (onshore and offshore) and proposed LNG facility site (and alternatives)

 

Topics

You might also be interested in

General Content
Refining
Perspectives
Oil spill tracking: an industry innovation
Case study
Browse Siting Study