Battery energy storage project

solar into energy

This project included the conceptual design of a 30 MW x 4 hours Battery Energy Storage System facility (BESS) for location in Southern California.

Our Approach

Advisian undertook the design of the balance of plant to accommodate TESLA battery modules with support systems for the project. Advisian's scope to design the facility entailed civil, mechanical, electrical and structural disciplines. The design included the 220kV electrical switchyard to connect the BESS with a local substation. 

Value Delivered

This project shows proof of design concepts for integrating large-scale BESS with the grid in a confined environment (suburban) minimizing impact on local commercial establishments and residences, and created additional information for an Energy Storage Database.

You might also be interested in

Perspectives
Community Microgrids - Offering grid modernization and community development
Case study
Transmission Lifecycle Program
Case study
Fuel cell performance and cost attribute study
General Content
Advisian completes advisory project for acquisition of largest US district energy business